Project Manager vs Builder vs Town Planner: Who Does What on a Duplex or 1-into-2?

Brisbane Town Planners ·

Short answer: it depends on the site. A simple duplex on the right block may only need a builder and a building certifier, with no development application and no project manager. A 1-into-2 subdivision, or a duplex on a constrained site, usually needs a town planner for the approval, a surveyor for the new lots, a licensed builder or civil contractor for the works, and someone to keep all of them moving in the right order until the job is signed off or the new titles are issued. That someone can be you, or a project manager.

Why it gets confusing

A small development looks simple from the street: one block, one or two new homes. Behind it can sit a development approval, a list of council conditions, engineers, utility connections, a survey plan and a titles lodgement. Each person on the job only owns their piece. Nobody owns the whole thing unless you hire someone to, or do it yourself.

Who does what

  • Building certifier: assesses and approves the building work against the building rules, and inspects it during construction. On a simple duplex this may be the only approval you need.
  • Town planner: checks what the site allows and which approval pathway applies, prepares and lodges a development application where one is needed, deals with council, and advises on the conditions of approval.
  • Surveyor: measures the site, sets out the new boundaries and prepares the survey plan for the new lots.
  • Engineers: design sewer, water, stormwater, driveways and earthworks to meet council and Urban Utilities standards.
  • Builder or civil contractor: builds the homes or the civil works. Building work in Queensland needs a QBCC-licensed contractor.
  • Project manager: lines up the consultants and contractors in the right order, tracks every condition, manages council and utility applications, and keeps the programme and budget on track, through to sign-off or new titles.

What a project manager actually does

A project manager is the one person looking at the whole project. On a duplex or 1-into-2, that usually means:

  • Reading the approval and turning every condition into a task with an owner and a date
  • Engaging and coordinating the engineers, surveyor and contractors
  • Managing applications to council and Urban Utilities, and the Energex and NBN connections
  • Keeping the work in the right order, so you don't pay twice for something done too early
  • Getting the plan sealing application lodged and the new titles registered

A project manager doesn't replace the builder. The builder builds; the project manager makes sure everything around the build happens on time.

Do you need one?

It comes down to how complex the site and the approval process are. Not every duplex needs a development application. On the right block, in the right zone, with no overlays getting in the way, a duplex can go straight to a building certifier and a builder. In that case you likely don't need a planner or a project manager at all. The first step is finding out which pathway your site is on.

A project manager is usually worth it if:

  • It's your first development
  • You work full time and can't manage calls and site meetings during the day
  • Your approval has a long list of conditions, or the site has overlays, a long driveway or tricky services
  • You're splitting a block to sell the new lot, so delays cost you holding costs and sale timing

On more complex projects, most delays come from conditions and approvals, not construction. Our guide to what happens after your DA is approved walks through every step.

Why a town planner makes a good project manager

The hardest parts of a small development are often the planning and council steps: conditions, compliance and plan sealing. A project manager with a planning background reads the approval properly from day one and sees problems months ahead. For a full breakdown of the stages, see do you need a project manager for your subdivision?

What it costs

Project management on a small development is usually quoted as a fixed fee per stage, paid at milestones, so you know the full cost up front. The fee depends on how complex the site and conditions are. Compare it with the cost of a few weeks' delay in holding costs, or a condition missed until plan sealing. For the bigger picture, see our guide to what a subdivision costs in Brisbane, and if you're weighing up a duplex, can I build a duplex on my block in Brisbane?

Planning a duplex or 1-into-2? Send us the address and we'll tell you which approval pathway your site is on and how we'd run the project. Your first look is free. Talk to us about your project

FAQ

Does every duplex need a development application?

No. Some duplexes in the right zone and on a suitable block can be approved through a building certifier alone. Others need a development application because of the zone, lot size or overlays. We can tell you which applies to your site.

Can my builder be my project manager?

Some builders offer design and construct packages that cover approvals and conditions. Many don't, and leave the council and utility steps to you. Ask exactly which conditions and applications they'll handle before you sign.

Can my town planner project manage the build?

A planner can manage the approvals, conditions, consultants and plan sealing. The construction itself must be done by a QBCC-licensed builder or contractor.

When should I bring in a project manager?

If your project needs a development application, ideally before you lodge it, so the application is set up for a smooth post-approval stage. You can also bring one in after approval.

What does a project manager not do?

They don't do the building work, the engineering design or the survey. They coordinate the people who do.

Do I still need a surveyor if I have a project manager?

Yes, if you're creating new lots. Only a surveyor can prepare the survey plan that creates them.

Already have an approval? We can step in at any stage after approval and take it through to new titles. Send us your approval and address